Horizonte House

New perspectives for living well.

Area
100 m²
Build time
160 days
Bedrooms
3 bedrooms, 2 of them suites
Levels
Two levels
Horizonte House, facade illustration
Facade with pool, optional. Illustrative render.

Inside the Horizonte

The largest home in the catalog. Two levels, three bedrooms (two of them suites) and open spaces for a family with children or for those who host often, with plenty of room to enjoy nature.

Horizonte House: two-level home with a ceramic roof, a pool and coconut palms at sunset
Facade with pool, optional. Illustrative render.
Horizonte House: living area open to the porch, with a ceiling fan and a view of the pool
Living area open to the porch. Illustrative render.

1 / 2

Included in the house

Finishes and utilities per the specification of the Horizonte House.

Water and bath

Main and shower valves, showerheads, drains, bidet sprayers and faucets for the bathroom, laundry and kitchen.

Fixtures and basins

Bathroom, laundry and kitchen basins, siphon kit and toilet.

Finished countertops

3 bathroom, 1 kitchen, 1 laundry and 3 wardrobes (2.00 × 0.80 m), finished in masonry with burnished cement, linen curtains and native-wood shelves.

Lighting and electrical

Wall sconces and pendants, spotlight tracks, outlets and switches.

Hardware

Door handles, locks, latches, hinges, pulls and bolts.

Wall finish and protection

Ceramic or burnished cement in wet areas and resin over the eco brick inside.

Build your Horizonte House

Choose the add-ons you want for the house and request a quote with your selection. The price comes in writing.

Gourmet porch packages
Individual items
Leblon Aguazul poolLeblon Aguazul poolInstalled with filter and pump.
Covered pergolaCovered pergolaEucalyptus with clear polycarbonate.
Water reserveWater reserveFortlev tank with pump, for more day-to-day autonomy.
Eco brick barbecue
Outdoor cold-water showerWith round eucalyptus frame and floor.
Garden faucet
Extra outlet
Extra light fixture
Ceiling fan1 m blade radius, already installed.
Air conditioning9,000 BTU, installed.
Add-ons selected0See summary

Request your quote for the Horizonte House

Tell us a little about yourself and where you are. Clarice replies on WhatsApp and schedules a video call, no strings attached.

  • A quote made for you, sent one to one
  • Free first video call
  • Final quote in writing, made for you

When you send, we open WhatsApp with your message ready. We use your data only to answer your request.

160 days from the first day of construction to the key

The schedule of the Horizonte House, stage by stage, in calendar days. The margin for rain and the unexpected is already built into the timeline.

  1. Foundation and raised slab Days 1–oNaN days
  2. Structure, mezzanine floor and stairs Days o1–tNaN days
  3. Walls and utilities (two levels) Days t1–aNaN days
  4. Roof Days a1–oNaN days
  5. Doors and windows Days o1–oNaN days
  6. Finishes, countertops and fixtures Days o1–iNaN days
  7. Final cleaning and inspection Days i1–iNaN days
  8. Margin for rain and the unexpected Days i1–aNaN days

Before day 1: 30 days of pre-build, with project approval, water and power, clearing the plot and planning. City hall approvals run separately. Understand the path

Layout of the house

  • Two levels
  • Living, dining, kitchen, laundry and stairs, on the ground floor
  • 3 bedrooms, 2 of them suites
  • 3 bathrooms
  • Outdoor area left free for optional extras
  • Total proposed area: 100 m²

Materials

Base
Raised slab 45 cm above the ground
Structure and mezzanine floor
Per the structural design
Walls
Exposed eco brick
Roof
Terracotta ceramic tile with waterproofing membrane
Ceiling
Pine
Doors and windows
Wood and glass
Flooring
Burnished cement

Execution

Pre-build
30 days, before the first day of construction
Build time
160 calendar days, with a margin for rain and the unexpected
Water tank
1,000 L
Utilities
Electrical and plumbing per the designs
Planning
Weekly, with the LPS method, and scheduled site visits
Warranty
30 days for services, with 24-hour support, and 1 year for products and structure

Other models

Customer Care