How much does it cost to build a house in Serra Grande, Bahia?
The plot, the access, the foundation and the outdoor areas weigh on the price as much as the floor area. Here is how we put together a quote for a home in Serra Grande, with a real example.

You arrive at the plot late in the afternoon. Where you pictured the living room, you find a pleasant breeze. A little further on, the shade of a tree falls right where a table would fit. The porch moves before it even reaches paper.
That is how a house starts to take shape. And it is also how we start to understand what it will cost.


The first visit already changes the numbers
When BioConstrutora assesses a plot, we start with three things we can see on the spot: how the team and materials will get in, how the ground changes level and where the water drains. That information helps define where the house can go and what has to happen before construction starts.
Imagine you want an 80 m² house with a porch facing the garden. If it sits on the highest part of the plot, it may catch the breeze you noticed on the first visit. The same choice can change the floor height, call for a different foundation and lengthen the route between the gate and the building site. On the visit, the conversation was about where to put the table. In the quote, it already involves foundation, drainage and moving materials.


From the floor plan to the quantities in the quote
In Sargi, in Serra Grande, we quoted a two-story home with 81.64 m² of enclosed area. Besides the house, the project included a 41.60 m² pergola and a compact fiberglass pool. In the quote, each of these items had its own breakdown.
To price the pergola, for example, the team counted the treated eucalyptus pieces, the metal supports, the hardware, the wood finish and the assembly work. The pool called for the excavation, the base and the filtration system. Looking only at the house's 81.64 m² leaves out a considerable part of what will be built and used every day.


With the BioMétodo, we apply the same level of detail to the house itself. The raised slab, which we call the floating house, has a reference height of 45 cm above the ground, with the exact level set for each project. On the walls, compacted earth bricks made locally without added cement can be left exposed. In that case, the texture of the earth is already part of the finish, and the quote covers the care of the joints and the protection of the surface. On the roof, the eave that shades the porch shows up in the numbers as wood, ceramic tiles, waterproofing and labor.
How does the BioMétodo factor into the cost of a sustainable home?
In the BioMétodo, the floating house uses a slab raised 45 cm off the ground as its reference. This keeps the floor out of direct contact with the soil, and the height and foundation are detailed for each project. In the Sargi example, the ground floor was set 35 cm above the street, the reference adopted for that project.
On the walls, one of the materials in our system is the compacted earth eco brick, made locally without added cement. When the bricks are left exposed, the earth itself gives the house its color and texture. The work calls for care with the bond pattern, the joints and the protection of the surfaces. Those services are part of the quote, as are the carpentry labor, the wood treatment and the roof installation.
The same logic applies to treated eucalyptus, the pine ceiling and the ceramic tiles made in Bahia. The cost of each choice includes the piece and the work needed for it to perform well in the house. A wide eave, for example, involves the wooden structure, the tiles, the trims and the rain drainage. In the finished house, it also creates that patch of shade where a table or a hammock fits. Learn about BioConstrutora's BioMétodo.


Catalog model or custom design?
If you already know how many bedrooms you need and have an idea of the size, starting from the catalog helps you see what fits the budget. The floor plans have a defined structure, and choices such as a pool, a pergola or an outdoor kitchen are discussed alongside the plot and the finishes. A compact chalet calls for a different layout than a house for hosting the family, and looking at the plans usually settles that choice faster than comparing floor areas alone. See BioConstrutora's houses and chalets.
In a custom design, the quote follows the particulars of the plan. Two stories bring a staircase, an upper slab and railings. Bedrooms in separate bungalows change the layout of the roof, the utilities and the outdoor circulation. These choices explain why two houses of similar size can receive different quotes.
What should you check before approving a construction quote?
Start with the description of the house and the outdoor areas. Check that the foundation, roof, waterproofing, utilities, windows and doors and finishes are specified. Then see how the quote handles pre-construction, complementary designs, fees, permanent utility connections, landscaping and furniture. These items may be contracted separately, depending on the scope.
It is also worth reading the schedule alongside the quote. Knowing when the foundation starts, at what stage the windows and doors arrive and what has to be decided before the ceiling is closed helps you keep track of purchases, payments and progress.

Thinking of building in Serra Grande, in Sargi or elsewhere on the Cocoa Coast? Tell us where the plot is, how many bedrooms you have in mind and which spaces make a difference in your routine. If you are still choosing a plot, tell us which areas you are looking at. With that information, we can talk about the models, the plot conditions and what needs to go into the first estimate. Request a quote from BioConstrutora.
How to start planning your home in Serra Grande
If you already have a plot in Serra Grande, send us the location, the approximate measurements and a few photos of the plot and the access. If you are still looking, tell us which part of Serra Grande you would like to live in and what the house needs to hold. It might be a room for guests coming from far away, a place to work in the morning light or that shaded table you pictured on the first visit.


With that information, we can make a first estimate and show you which choices will weigh most on your budget. Talk to BioConstrutora about building in Serra Grande.


